TEKMORN · Case Study

Bonatti × Motor Oil Hellas — New Naphtha Project

How TEKMORN (Alexandros Adamis) integrated QA/QC automation with project management to deliver audit‑ready documentation, 100% Quality KPIs, and robust support for variation claims.

Jump to Results Back to Portfolio

Project Snapshot

  • Client: Bonatti S.p.A (EPC) for Motor Oil Hellas
  • Location: Agii Theodoroi, Greece
  • Duration: Dec 2020 – Dec 2022
  • Role: Deputy QA/QC Manager & PM Support
EasyPlantEasyPipingPythonISO 9001ASME IX

Disciplines: Piping · Mechanical · Structural · E&I · Coatings

Overview

The New Naphtha Project required high‑volume, multi‑discipline QA/QC documentation with live progress visibility and traceability across EPC stakeholders. TEKMORN designed and deployed automation and data workflows connecting field inspections, engineering, and planning systems for a single source of truth.

Challenges

  • Fragmented QC documentation across subcontractors; limited real‑time visibility.
  • High documentation throughput (hydrotests, fabrication, erection, bolting) with manual issuance.
  • Need to align QA/QC evidence with planning (EasyPlant/EasyPiping) and cost/claims.
  • Audit readiness for multiple parties (Technip, DNV, Corporate).

Role & Actions

  • Led 15+ QC inspectors; established unified document control and traceability.
  • Developed Python tools to automate issuance of hydrotest, fabrication, erection & bolting certificates (>500k forms).
  • Built KPI dashboards and weekly progress alignment with planning (EVM inputs).
  • Created digital handover structure (mechanical completion) for hardcopy + electronic dossiers.
  • Provided technical substantiation and evidence packages supporting variation claims (€21M+).

Results & Metrics

100%
QA KPI achievement (two consecutive years)
>500k
QC forms auto‑issued (hydrotests, fab, erection, bolting)
≈70%
Cycle‑time reduction; automation outperformed 5–6 manual roles
€21M+
Variation claims technically substantiated
3/3
Audits passed with Excellency remarks (Technip, Bonatti Corporate, DNV)
↓4w→1w
Punch closure on deliverables reduced from ~4 weeks to 1 week

Tools & Standards

EasyPlantEasyPipingPythonExcel VBAISO 9001:2015ASME IXAPI 650EN 14015

Key Takeaways

Automation and early integration of QA evidence with planning and cost controls yielded measurable schedule stability, faster handovers, and audit‑ready compliance. TEKMORN's data workflows enabled verifiable KPIs and supported significant commercial outcomes.

Discuss a similar project Back to Portfolio